Skip to content

Builders cleans, floor care, graffiti removal, vacate and pre-sale cleaning across Greater Melbourne

Who we areRequest a written quote

Pricing

Builders Cleaning Prices in Melbourne

This page explains builders cleaning prices and after builders cleaning prices in Melbourne: how a builders clean cost is worked out, what a typical rate per square metre or per hour looks like in 2026, and which things push a quote up or down. It is written for builders budgeting a tender and for owners checking whether a quote is fair. If you first want the detail of the work being priced, read how our builders cleaning service runs.

Builders cleaning prices Melbourne: blank itemised quote sheet, calculator and tape measure on a site desk
Illustrative image
Per square metreFor defined stages and handovers
Per hourFor touch-ups and variations
Fixed in writingOnce the scope is agreed

How pricing works

How are builders cleaning prices worked out?

Most builders cleans are priced per square metre of floor area for each stage, with glass, access and timing added as their own lines. Hourly rates cover small or unpredictable work. After builders cleaning prices for owners follow the same logic, adjusted for furniture, belongings and rooms already lived in.

Floor area comes first because it is the one number everyone agrees on. It is on the plans, it does not change, and it scales sensibly: a 400 square metre office takes roughly twice the time of a 200 square metre one. The rate per square metre then reflects the stage, because a final clean involves far more detail per metre than a rough one.

Everything that does not scale with area gets its own line. Full-height glazing, a tenth-floor site with one goods lift, a Saturday start or a floor covered in mortar splatter all add time that area alone would miss. Keeping those lines separate is what lets you compare quotes fairly and see what you are paying for.

The table below shows the kind of figures Melbourne builders and owners are being quoted in 2026. Treat them as a guide to whether a quote is in the right territory, not as our price list; the figure you pay is the fixed one on your scope.

How a quote is builtExample layout

  • Floor area × stage rateFrom the plans, per stage you bookBase
  • Glass and glazingInternal, and external where safely reachable+ line
  • Access and heightLifts, stairs, parking, high ceilings+ line
  • ConditionHeavy splatter, paint on glass, debris left+ line
  • TimingNights, weekends, short notice+ line
  • ExtrasVinyl seal, waste removal, touch-up visitOptional

Fixed price for the scope In writing

Typical Melbourne builders clean prices in 2026 (indicative)
Type of cleanUsual pricingTypical rangeNotes
Final handover clean, new housePer m²About $8 to $12 per m²Lower end for project homes, higher for premium finishes; usually includes internal glass
Single stage on a larger sitePer m², per stageAbout $3 to $8 per m²Rough cleans sit at the bottom, practical completion cleans in the middle
Variations, touch-ups, defect returnsPer hour, per cleanerAbout $50 to $90 per hourUsed where the amount of work can't be fixed in advance
Owner's after builders cleanPer job or per m²Priced from rooms and conditionOccupied homes take longer than empty ones

Ranges are drawn from 2026 price guides published by Melbourne cleaning businesses and are indicative only. Check whether any quote you receive includes GST. Your Cleaningia price is fixed in writing after we review the plans or walk the site, and it does not change unless the scope does.

A quick worked example: a 220 square metre new house needing a final clean at $10 per square metre comes to about $2,200 before any glazing or access lines. That is only an illustration of the maths, but it shows why an honest quote starts with the floor area and the stage, then adds what the building itself demands.

Two things to check on any figure. First, GST: some quotes show it, some add it at invoice, and on a large job the difference is significant. Second, what "final clean" means to that company. For some it includes inside every cupboard, the glass both sides and a buffed floor; for others it is a wipe-over and a mop. The rate per square metre only means something once you know what sits behind it.

Square metre or hour

Should you pay per square metre or per hour?

Pay per square metre when the scope is clear, such as a defined stage or a handover clean, because you know the total before work starts. Pay per hour only for work that can't be measured upfront, like touch-ups after trades return, and ask for an hours cap in writing.

Three ways a builders clean is priced
QuestionPer square metrePer hourLump sum per stage
Best forDefined stages, handover cleansTouch-ups, defect returns, unclear scopeRepeat builders with standard designs
You know the totalYes, before work startsOnly afterwards, unless cappedYes
Easy to compare quotesYes, if stages matchHard, speed varies by crewOnly between like-for-like homes
Main riskArea measured differentlyHours running overScope creep between jobs
Weekday
Saturday
Sunday
$27.08
$40.62
$54.16

These are the minimum hourly rates for a full-time level 1 cleaner under the Cleaning Services Award, from the Fair Work pay guide in effect from 1 July 2026. A business also pays superannuation, insurance, equipment, chemicals, vehicles and travel on top. If an hourly builders clean rate is close to the award figure, something is being left out, whether that is the wages, the insurance or the quality.

What moves the price

What makes a builders clean cost more or less?

Floor area, the stage and the amount of glass move the price most. Condition, access and timing come next, then finishes and waste. A tidy single-level site with little glass costs far less per square metre than a glass-heavy fitout on an upper floor with night-only access.

Price factors ranked by impact
FactorImpactWhy it mattersHow to keep it down
Floor areaSets the base for every stageBook only the stages you need
StageA final clean is far more detailed than a roughCombine rough and PC on small jobs
GlassPartitions and full-height windows add real hoursKeep paint and silicone off glass during the build
ConditionSplatter and overspray take care to removeA rough clean before splatter cures
Access and heightLifts, stairs, parking and high ceilings slow crewsBook the lift and a parking bay for the crew
TimingNights, weekends and short notice cost more to staffSend the programme early
FinishesStone, timber and matt tiles need specific productsShare the finishes schedule
WasteNo skip means bagging and carting debrisKeep a skip on site until the final clean

Commercial jobs add a layer. Post-construction cleaning prices for fitouts and new buildings depend heavily on building rules, because night-only access and lift bookings change how many shifts the work takes. The detail is on our page about post-construction cleaning for commercial sites.

For homeowners, the biggest swing is whether you are living there. An empty renovated home is quick to clean; the same home with furniture back in and a family working around the crew takes noticeably longer. If that is you, our after builders cleaning for owners page explains what is involved.

Builders with a steady run of similar homes can often get a set rate per stage, agreed once and applied to each new job without a fresh quote. It suits project and volume builders whose designs repeat, and it saves the site manager chasing a price every time a slab goes down. Ask us about it if that sounds like your business.

Your price

How do you get an accurate builders clean price?

Give us the floor area or plans, the stages you want, the finishes schedule, access details and your dates. With those we can price each stage per square metre and list any extra lines, so the fixed figure you accept matches the site and does not move on the day.

Photos help a great deal for owners' cleans and smaller jobs. For larger builds, a twenty-minute walk with the site manager is usually worth it, because it shows us the glass, the access and the condition in a way plans never do.

When you compare quotes, line them up stage by stage. Check each one covers the same glass, the inside of the joinery, the same floor finish and a walk-through at the end. Ask each company to state its crew size and the hours it expects to spend. A price that looks cheap because it quietly leaves out half the glass rarely stays cheap once the defects list arrives.

Payment is straightforward. We invoice when each stage is signed off, so on a staged job you are not paying for work that hasn't happened yet. Any variation agreed on the day appears as its own line with the note of who approved it.

Ready to find out? Request a fixed builders cleaning price and include your plans or a few photos.

Checklist: comparing builders clean quotes

  • Same stages quoted by each company
  • Internal and external glass spelled out
  • Inside joinery and appliances included
  • Floor finish named: mop, scrub, buff or seal
  • Crew size and hours on site stated
  • GST shown, and the price fixed in writing
  • A final inspection with you before the crew leaves

Questions

What else do people ask about builders clean costs?

Rates, windows and hours: the three pricing questions we are asked most.

What is the price per square metre for a builders clean?
In Melbourne in 2026, a full final clean on a new house is commonly quoted at around $8 to $12 per square metre, while single stages on larger sites sit lower. The exact rate depends on the stage, the finishes and the glass, and yours is confirmed in writing once the plans or site have been reviewed.
Are windows extra?
Internal glass is normally part of a final clean, but large areas of glazing are usually priced as their own line because they add real time. External glass that needs a boom lift or rope access is always separate. Check how each quote handles glass before comparing totals.
What is the hourly rate for a builders clean?
Hourly work is commonly quoted at around $50 to $90 per cleaner per hour in Melbourne, depending on the day, the equipment and the company. We use hourly pricing only for touch-ups and variations, and we agree a cap before starting so the total can't run away.

Want a number you can put in the budget?

Send the plans and the stages. You will get a fixed price per stage, with every extra line shown.